» News & Article

LIHIR GOLD MINE - TAILING THICKENER Lihir Gold Mine - Tailing Thickener
General Scope of Work :  Supply of steel raw material +/- 1500 Tons,  Supply of shop construction drawings, Fabrication of steel structure and precision plateworks and trial assembled as a precision giant equipment, NDT & QA/QC Inspection, and MDR (manufacturing data report), Surface protection external surface, Rubber Lining and packing for sea transport Client : FLSMIDTH MINERAL – GOSFORD NSW AUSTRALIA for End User LIHIIR GOLD MINE ................. More

Bolted Thickener - Hope Downs 4 Mining, Pilbarra WA (Rio Tinto)
Again, After successful with similar Bolted Thickener at Cadia Mine, Flsmidth Mineral Australia assigned Lintech to do complete supply, fabrication, preassembly, packing and FOB one complete set for final destination Pilbara Mine (WA) – Rio Tinto operation. Lintech is committed to continuosly deliver high quality product, Australian standard quality at Indonesia’s competitive price and excellent services. Client : FLSmidth Pty Ltd ................. More

Lintech Seaside Facility Project
Oil&Gas, Marine, Mining & Industrial Engineering - Fabrication - Construction LINTECH SEASIDE FACILITY PROJECT – PIPING, STRUCTURE, PONTOON, TANK, SILO, MECHANICAL WORKS WITH SIZE AFTER ASSEMBLE BIGGER THAN 6MX6MX6M, It will require to be manufactured and assembled at Lintech Sea Side Facility. This New Sea Side facility is being supported by Existing 20,000sqm Lintech Surabaya’s Steel ................. More

Martabe Mining Plant Structure
Lintech has completed several steps of bidding and technical clarifications to finally awarded this capital project. Experienced staff and workers, Quality control and timely experiences have put this project in the correct hand of Lintech for trouble free execution up to completion, delivery Free on Truck on site Martabe. Congratulation for the End User for using the quality products for their very infrastructure that being made at Lintech Shops. End User       : PT.AGINCOURT RESOURCES – Martabe Gold Mine Fabricator     : Lintech Surabaya Shop and Lintech Seaside Facility (LSF) Delivery Time : No Building Due Date 1 Grinding Area 19-Mei-11 2 Leach ................. More

SAIPEM - Karimun Island Diesel Storage Tank
 SAIPEM – KARIMUN ISLAND DIESEL STORAGE TANK Client                        : PT.SAIPEM INDONESIA (ENI) Completion Date   : TARGET September 2010 General Scope of Work : - DIMENSION/CAPACITY: 2 Storage tank : Dia. 9000mm x Height 9000mm/575.000 liters 1 Storage Tank : Dia. 4500mm x Height 4000mm/60.000 liters - Supply of steel raw material, - Supply of shop construction drawings, - Fabrication Assembly, - NDT & QA/QC Inspection, - Surface protection external surface, and packing for sea transport - Insurance and SEA TRANSPORT delivery from Lintech Seaside Facility to SAIPEM’s JETTY at KARIMUN ISLAND- RIAU - KARIMUN Site ................. More

Lihir Thickener succesfully shipped from LSF
Again, LSF successfully complete 2 Ea x 45m diameter thickeners for Lihir Gold Limited, Lihir island, Papua Newguinea. The shipment utilize barge 300ft (5000DWT) at LSF wharf. Along with the approval of the port operation, LSF is now legally able to import and export project material from and to regional Indonesia's island or overseas. We work closely with custom department and local port authority for fast and effvicient services at ................. More

Page : « First « Previous 1Next » Last »