LIHIR GOLD MINE - TAILING THICKENER Lihir Gold Mine - Tailing Thickener

General Scope of Work :  Supply of steel raw material +/- 1500 Tons,  Supply of shop construction drawings, Fabrication of steel structure and precision plateworks and trial assembled as a precision giant equipment, NDT & QA/QC Inspection, and MDR (manufacturing data report), Surface protection external surface, Rubber Lining and packing for sea transport

Client : FLSMIDTH MINERAL – GOSFORD NSW AUSTRALIA for End User LIHIIR GOLD MINE (PNG)




Source : Lintech Seaside Facility